Great point George, I had never thought of doing a secondary risk assessment until a most recent RFP project required doing something similar. It was an RFP that involved software and licenses, and a secondary assessment was done once the top ranked solution was selected to ensure its functions still fell within the accepted risk parameters.
I would agree with both of you. Ensuring that requirements are clearly defined with the help of the Rfx team is an important step in avoiding future confusion. Say what you mean and mean what you say comes to mind. Having been part of excellent Rfx teams, and also part of questionable ones, I truly appreciate how things come together much better with an engaged team.
Hi Alexandria, this is another excellent example of how what one may think is clear instructions/wording, is not always interpreted the same way by others. I like how you break down walking through each stage, and I would also add walking through each stage with a different lense, perhaps even that of a perspective proponent/bidder.
This article outlined what can happen when instructions are not clear and concise when dealing with requirements for an RFP type project.
We now know that Mandatory Response Requirements are specific criteria that proponents/bidders must include with their proposal/submission to be deemed complaint.
By comparison, we also know the that Mandatory Performance Requirements are deliverables, performance standards and other specifications that must be provided during the term of the contract.
I think that the two points regarding the transfer station could have worded differently and classed separately.16. PERMITS, LICENSES AND APPROVALS: The Contractor shall obtain at his own expense all permits, licenses and approvals necessary to satisfactorily provide garbage collection and disposal service during the term of this Contract.
I think this should have been classed as a Mandatory Response Requirement. The permits, licenses and approvals regarding the garbage collection and disposal should be provided as part of the bid submission. These are required before any collection can begin.10. TRANSFER STATION: The Contractor shall be responsible for providing an indoor Transfer Station within the boundaries of the Town of Sackville and the Contractor will be responsible for the complete operation of the Transfer Station. The minimum hours of operation shall be 8:00 a.m. to 4:30 p.m., Monday to Friday and 6:00 a.m. to 10:00 a.m. on Saturdays
I think this should have been reworded to say:
The Contractor shall be responsible for providing use of an indoor Transfer Station within the boundaries of the Town of Sackville. If the Contractor (awarded Proponent) does not own a Transfer Station at the time of bid, a detailed description regarding their plan must be submitted which includes but is not limited to how they plan to avoid a disruption in service. The Contractor (awarded Proponent) must have their own Transfer Station operating before the end of the first year of the contract, and licenses, permits and approvals for the construction of the transfer station must be provided within 120 days of award at the cost of the Contractor (awarded Proponent). The minimum hours of operation shall be 8:00 a.m. to 4:30 p.m., Monday to Friday and 6:00 a.m. to 10:00 a.m. on Saturdays.Having proper planning and several eyes proofreading documents like these can go a long way in avoiding circumstances such as this one.
November 11, 2026 at 7:05 pm in reply to: 2 (B). Which Challenges Will most Affect Public Sector Procurement in the next 5-years? #36388I agree Candida, while the initiatives themselves are great ideas and may not seem to offer challenges, they certainly can for those of us in the public sector. Having to change policies and procedures for each potential initiative can become cumbersome to follow. It can be difficult for the enablement team to prepare these policies, and difficult for the procurement teams to follow all the changes while still pressing on with the typical procurement projects that we have as well.
November 11, 2026 at 7:00 pm in reply to: 2 (B). Which Challenges Will most Affect Public Sector Procurement in the next 5-years? #36387Thank you Alexandria, this may be an approach that more of us start practicing. One thing I’m noticing with remote workplaces, is that anyone located in rural areas may struggle with their cell phone service and reception. This is causing small delays as clients are only being answered when our voicemails are checked and messages replied to. I have guided some clients to message me via Teams before sending “new” emails with attachments so that I am aware of what is coming.
November 11, 2026 at 6:54 pm in reply to: 2 (B). Which Challenges Will most Affect Public Sector Procurement in the next 5-years? #36386Hi Chantal, I had never thought of IT modernization and AI as a challenge. But when you describe it as you have, I now see that it certainly can present a challenge if we do not have properly trained personnel that keep up to date with these changes.
November 9, 2026 at 9:05 am in reply to: 2 (B). Which Challenges Will most Affect Public Sector Procurement in the next 5-years? #36288I think one potential challenge that may affect public procurement (at least within the maintenance aspect) is a lack of interested proponents, and a lack of qualified proponents. We are seeing a decline in bids received on certain projects. I specifically had a vendor decline to bid on a snow removal project a few years ago due to a shortage of qualified staff. With a shortage of personnel and the alure of larger more lucrative contracts, a lot of our mid-level contracts are starting to see a gradual decline in bid submissions. I am concerned that this trend may continue leading us to have even fewer bids to choose from. Combine this with extremely volatile fuel prices and we may face the risk of not only fewer bids, but much higher priced ones as well.
Hi Tabitha, I like your point of providing the floor plans prior to the bid. Doing so would have given potentially given a clearer picture of the overall square footage of carpet that would be used. They could have factored in a certain percentage variance for additional spaces that may have been identified after work began. Regular audits would allow the OCHC to conform they were receiving what was quoted, but I think where OCHC slipped up the most was by approving the invoices without proper diligence. They were no formal verifications to ensure what was billed was the proper quantity, quality and price. OCHC’s payment process (or payment approval process) seems to be where the one of the larger errors occurred.
Great points Eileen, I think all of these could potentially eliminate the problem of over-billing. TO me what appeared to happen was the OCHC seemed to properly prepare an RFP up to the point of award and then simply decided their work was done. While Argos were shady in how they did their business practice, it would not have happened without the OCHC allowing it to.
Hi Alex, I really like how you phrased your third recommendation. I feel as though some of us may have insinuated that OCHC should follow through with their contractual obligations, but you explicitly stated it. I feel that this along with a proper approval system would be crucial in eliminating the over-billing.
-
This reply was modified 2 weeks, 4 days ago by
Andy Rioux.
-
This reply was modified 2 weeks, 4 days ago by
Andy Rioux.
The three recommendations I would have are as follows:
1 – Better contract management: It was said in the article that contract documentation included detailed procedures, specifications for quality and installation. Provisions also included OCHC’s obligation to determine and verify performance. It was clear that these directives were not followed by either party. Requiring an authorized staff of OCHC verify and sign off on all work orders as they are completed. Any quality or quantity objections should be identified and discussed at this point in the process. I think one thing that I would have changed during procurement process, is that as part of the evaluation process, I would have asked the vendor for a sample of the product that they were to use. If that sample was approved by the OCHC team, it could then have been compared to the product used in each installation to determine/confirm that it was indeed the same/approved product being installed each and every time.
2 – Have a proper accounting system that the pricing can be prebuilt into their purchase orders. If the invoice sent by Argos does not match the price of the purchase order, it would fall under exception and not be paid until reviewed by someone with authority to accept the change, or the authority to speak to an Argos representative to have the invoice corrected. An integral part of this step would be ensuring that properly trained accounting staff are in place. Ensuring the invoices have been properly vetted could have gone a long way in preventing a situation such as this. This is achievable by stating that invoices being found to be unpaid due to an exception due to an issue (pricing, quantity, labor, etc.) may only be paid once approved by the project manager or another OCHC staff member designated with such authority. This ensures that more than one set of eyes sees the invoices and invoices cannot be approved/paid by anyone other than those designated with authority to approve.
3 – Require that all invoices be detailed and show line-item pricing (no lump sum invoices accepted). One way to achieve this would be to require the project manager to approve all work that has been completed and compare it to a work order prepared by Argos, ensure that the work order matches what product quantity and quality was installed and amend their purchase order accordingly so that invoices (if properly prepared by Argos) may be processed with less chance of having any discrepancy.
Hi Tabitha, I am inclined to agree with your assessment of the topic. At the end of the day, a General Contractor is always responsible for the subcontractors they may hire. Any mistakes that are made by a subcontractor are typically the responsibility of the general contractor. The General Contractor may try to recoup some of the costs associated with the incident from the subcontractor, but I’m not sure if they would be successful. I would certainly be curious to know the outcome of this case study.
Hi Eileen, your view regarding the second point and how the subcontractor can’t avoid liability resonated with me. It has me questioning what may have been the outcome had they refused? On one hand they expressed to the general contractor their concerns all of which were underestimated. On the other hand, they proceeded with the work regardless.
Could they possibly have been faced with the dilemma of this costing them no matter what their choice was? For example, did the General Contractor threaten litigation if they did not perform the task they were contracted for? Even if they had, if Vasco were experts in their field, they should know that they could have refused.
The other side of my thought was, if they are truly experts in their field, they should know that if their work causes damage regardless of precautions taken, they can be held financially responsible for the damages.
No party’s involvement is ever without risk, but as we’ve learned in the past, some parties may bear more of a share of the risk than others.Good point Candida. Without knowing the extent of the contract between the general contractor and the subcontractor, we must always be aware of the “right to refuse”. While the subcontractor had relayed their concerns to the general contractor, they still proceeded with doing the work. I feel like they should have refused due to obvious safety concerns.
I have personally witnessed an instance where someone has refused a task because it was too dangerous. They were not held responsible for damages caused by their refusal.
This is partially why I feel that if challenged, Vasco could be partially liable to the general contractor simply for proceeding with the work for which they had expressed concern, rather than walking away if the general contractor would not budge on their recommendations. -