• Skip to main content
  • Skip to footer
  • Home Page
  • Log in

The Procurement School

The Procurement School

You are here: Home

Renee Demone

  • Profile
  • Topics Started
  • Replies Created
  • Engagements
  • Favorites

Forum Replies Created

Viewing 15 posts - 1 through 15 (of 19 total)
1 2 →
  • Author
    Posts
  • November 24, 2026 at 10:24 am in reply to: 3 (B). Vested Outsourcing #36702
    Renee Demone
    Participant

      Hi Robyn,

      I am just curious about how they structured the procurement after the first round came in over budget, did they cancel and re-issue as a negotiated RFP or design-build? I think the approach is interesting, where the contractor was brought in early to help with the design and procurement stages to bring the project back into budget. A great vested outsourcing method would be for the ongoing building maintenance once the library opens.

      November 24, 2026 at 3:34 am in reply to: 3 (B). Vested Outsourcing #36691
      Renee Demone
      Participant

        I can certainly relate to that on janitorial contracts, Duanine. We see the exact same thing when cleaners are stretched too thin across sites instead of having steady continuity in one building. When they actually stay in one spot, they take pride in the condition of the building rather than just rushing through a checklist. Plus, in the public sector where cash bonuses aren’t an option, formal recognition and steady contract renewals are really the best way to reward good outcomes and keep contracts invested.

        November 24, 2026 at 3:26 am in reply to: 2 (B). E-COMM 911 Multi-Stage Procurement Process #36690
        Renee Demone
        Participant

          That’s a really good point about the privilege clauses, Barrott. Like I mentioned in my post, it really felt like E-COMM was loading up on the privilege clauses to give themselves an out when they really just needed the built-in negotiation room of an NRFP. Barring the Proof of Concept vendor from the RFQ and RFP was definitely the right call to keep the competition clean, especially since they were already paid for the test run and helped stage the final requirements.

          I also think you nailed it on the contract terms, when standard terms don’t apply and requirements are still shifting, trying to squeeze contract negotiations into Contract A just creates unnecessary legal risk compared to using an NRFP from the start.

          November 23, 2026 at 12:23 pm in reply to: 2 (B). E-COMM 911 Multi-Stage Procurement Process #36682
          Renee Demone
          Participant

            Fair point, Liz. I definitely phrased that a bit too loosely! I meant building structured documented dialogue stages right into the NRFP rules so everyone gets the exact same process, rather than informal off the cuff chats. That line about perception carrying the same weigh as reality is a great reminder even without Contract A, you still have to protect the integrity of the process so nobody feels another proponent get an unfair advantage.

            November 23, 2026 at 7:21 am in reply to: 3 (B). Vested Outsourcing #36675
            Renee Demone
            Participant

              Good point, Barrott. Hourly billing on software can easily drag things out (I’ve seen it in my last job on IT projects) when payment is tied to hours instead of finished work. It feel like an endless blank cheque. Paying for real deliverables and clear milestones keeps everyone focused on actually getting it done.

              November 23, 2026 at 6:56 am in reply to: 2 (B). E-COMM 911 Multi-Stage Procurement Process #36673
              Renee Demone
              Participant

                Thanks, Duanine. That is a really fair point about the public scrutiny and safety side of things. When millions of tax dollars and 9-1-1 dispatch are on the line, I can definitely see why they wanted the strictest “by-the-book” optics.

                For me, I still think you can keep that same level of transparency and fairness inside an NRFP, especially if you still bring in a fairness advisor without tying your own hands on normal conversations with vendors. Either way, it’s definitely a cool case to look at given the scales of what they were buying.

                I also agree with you on the upfront planning side. Taking the time to actually test the market and talk to users before locking down the RFP specs is huge, especially on a big public safety project where guessing wrong is expensive.

                Having fairness advisors in the room from day one definitely takes a lot of pressure off the procurement team when you’re navigating that many stakeholders and vendor conversations.

                November 23, 2026 at 6:44 am in reply to: Cohort (B) Assignment 1 – Peer Review #36671
                Renee Demone
                Participant

                  Hi everyone!

                  Looking forward to your feedback!

                  Thanks, Renee.

                  Attachments:
                  You must be logged in to view attached files.
                  November 23, 2026 at 5:10 am in reply to: 3 (B). Vested Outsourcing #36670
                  Renee Demone
                  Participant

                    For our organization (Municipal Shared Services), the local waste site performs lagoon sludging. Right now, a job like that is basically a once a year transaction. The contractor comes in, pumps out the sludge from the lagoon, and leaves. Contractors are essentially paid to do that one cleanup with no other requirements.

                    If we took a vested approach, we could move the focus from just paying for the annual pump-out to actually improving water quality and reducing sledge volume over time. The contractors are the ones who know the equipment and treatment side best, so giving the contractor more leverage to provide preventative tweaks throughout the year could save the waste site in the long run. As you know, open ended cash bonuses don’t really fly in municipal budgets or the taxpayers optics. However, awarding annual muti-year contract extensions would be a more realistic approach to hit the targets and keep the contractor interested.

                    November 21, 2026 at 12:34 pm in reply to: 2 (B). E-COMM 911 Multi-Stage Procurement Process #36654
                    Renee Demone
                    Participant

                      Reading this back, the amount of red tape just to talk to vendors is kind of crazy to me. I like that first responders were able to test the gear first. Having the end-users involved early with a live test site to before finalizing the specs was a wise decision. I also thought paying one vendor to run that test while barring them from bidding on the actual contract is a smart move to ensure the gear works in real life, while obtaining user buy-in without tainting the competition.

                      That said, I wouldn’t touch Contract A for the whole process on a tech project like this. If you have to hire fairness advisors just to sit in on clarification meetings and pack the RFP with privilege clauses so that your hands aren’t tied, it feels like fighting the process the whole way. For me, I would have created an NRFP for this whole complex project, it allows you to talk freely with vendors, make changes to the requirements, and negotiating solutions are built into the actual process. E-COMM wanted this exact flexibility, which is why they packed their RFP with so many privileged clause. Essentially they were trying to force a strict contract A tender to act like an NRFP. An NRFP just makes better sense if you need to pivot while reducing the legal risks of a strict Contract A.

                      November 19, 2026 at 9:16 am in reply to: 3 (B). What is Outcomes-based Commissioning? #36571
                      Renee Demone
                      Participant

                        I like how you connected landfill savings to resident benefits, Robyn. This actually sounds very similar to how our local waste site operates, where hauling is subcontracted on an as-needed basis and paid per ton. Paying by weight keeps costs tied to actual volume, though tying part of that fee to keeping garbage and plastics out of the loads would be an even better way to make sure the city gets clean, usable mulch for residents.

                        November 19, 2026 at 5:24 am in reply to: 2 (B). Fair Trade Towns in Canada #36561
                        Renee Demone
                        Participant

                          Hi Simon,

                          I am shocked by reading your post. It really is amazing how much local momentum and community pride there is up there, and honestly a little shocking to see how tough the practical realities can be. When small producers are already selling out locally, and raw inputs or goods have to travel two days!! adding costly certification steps just doesn’t always line up with how the market actually works. I see this as a great reminder that good policy intentions have to fit the real supply chain and budget pressures on the ground, especially when governments are watching spending closely. Thank you for sharing!

                          November 19, 2026 at 5:17 am in reply to: 3 (B). What is Outcomes-based Commissioning? #36559
                          Renee Demone
                          Participant

                            Oh, I love this idea Barrott. Anyone who has dealt with last minute field cancellations or frustrating rainouts will immediately see why this makes sense. Tying maintenance to scheduling to fewer cancellations and better weather calls is a great angle, and keeping municipal ownership while leasing out equipment protects public assets.

                            Thinking about Liz’s question on payment, having the municipality pay the contractor directly against clear metrics usually keeps public access and user fees fair. However, one thing I’d like to nail down early is how closures get verified, just so there are no grey areas between actual weather issues and staffing or maintenance gaps.

                            Totally separate, but it reminded me of the well drilling program down on the South Shore (Lunenburg County). The municipality will pay the contractor directly (up to $20k) and set up a loan on behalf of the resident for repayment. There are a lot of metrics involved, but it is possible! The resident will obtain 3 quotes and provide them to the municipality for review and selection. That way certifications, insurances etc. are all valid and meet compliance reducing any risk.

                            November 18, 2026 at 12:13 pm in reply to: 2 (B). Fair Trade Towns in Canada #36541
                            Renee Demone
                            Participant

                              Hi Barrott,

                              You made such a great point about indirect costs like vendor transitioning, training, and enforcement being much harder to measure than simple product price differences. Balancing those upfront costs against the long-term benefits of reduced supply chain risks and ethical sourcing is definitely a challenge. Doing the cost-benefit analysis upfront is key to making sure a fair trade policy actually works for the organization.

                              November 18, 2026 at 6:39 am in reply to: 3 (B). What is Outcomes-based Commissioning? #36535
                              Renee Demone
                              Participant

                                Hi Duanine,

                                Employment and job training is another great fit for outcome-based commissioning, as it focuses on sustained employment which gives providers the room to tailor their support. I think you also nailed one of the biggest procurement challenges, and that is making sure the outcomes are measurable. I think another factor to watch out for is the payment timing, the long delay (sometimes months) in outcome-based payouts can certainly create cashflow challenges for the smaller providers. I’ve seen this many times over the years.

                                November 18, 2026 at 6:01 am in reply to: 2 (B). Fair Trade Towns in Canada #36534
                                Renee Demone
                                Participant

                                  Duanine, I completely agree that public procurement is about overall value, not just the lowest price. I say that all the time when educating municipalities. Since we spend taxpayers dollars, our buying choices should support fair working conditions and sustainable practices. The key is building clear, objective Fair Trade criteria into our RFPs so we support those goals fairly without reducing the bidding pool.

                                • Author
                                  Posts
                                Viewing 15 posts - 1 through 15 (of 19 total)
                                1 2 →

                                Footer

                                The Procurement School

                                250-370-0041
                                hello@theprocurementschool.com

                                The Atrium
                                #301 - 1321 Blanshard Street
                                Victoria, BC V8W 0B6

                                • TRAINING
                                • PSPP
                                • Webinars
                                •  
                                • QUICK LINKS
                                • Home
                                • Contact
                                • Articles
                                • COMPANY
                                • About
                                • FAQ
                                •  
                                Terms & Conditions   Privacy Policy
                                © The Procurement School

                                Copyright © 2026 · Workstation Pro on Genesis Framework · WordPress · Log in